Thursday, May 25, 2017

Hulstein Excavating is expected to install watermain and perform residential service connections on Tuesday, May 30 for those residences within Phase A.  Phase A includes the area of Seneca Street from the 1136/1137 residences south to 10th Street. 


During the day, all residents on Seneca Street between 10th Street and 12th Street can expect water service to be turned off for up to 2 hours at a time while the connections are made.  Residents with critical water needs may contact Josh Pope with any concerns.

No comments:

Post a Comment