Hulstein Excavating is expected to install watermain and perform
residential service connections on Tuesday, May 30 for those residences within
Phase A. Phase A includes the area of
Seneca Street from the 1136/1137 residences south to 10th
Street.
During the day, all residents on Seneca Street between 10th
Street and 12th Street can expect water service to be turned off for
up to 2 hours at a time while the connections are made. Residents with critical water needs may
contact Josh Pope with any concerns.
No comments:
Post a Comment